Luxury Resort Sandals&Fitness Trainers|Arch-support+Quick-dry
Luxury Resort Sandals&Fitness Trainers|Arch-support+Quick-dry Luxury Resort Sandals&Fitness Trainers|Arch-support+Quick-dry
Home Fitness Quick-Dry Trainer
E-flite RC Airplane Apprentice STS 1.5m BNF Basic Transmitter Battery and Charger not Included Smart Trainer with Safe EFL3750

E-flite RC Airplane Apprentice STS 1.5m BNF Basic Transmitter Battery and Charger not Included Smart Trainer with Safe EFL3750

$ 99.00

$ 330.00

Save: $

Style:
  • Bind-N-Fly
  • Ready-To-Fly
Unavailable
Please select combo product attributes
The combo subtotal is $,SAVE$

Product Details

  • EASY TO FLY RC PLANE: Model's large size made it an ideal choice for better visibility and the ability to handle more wind while learning to fly at an RC club flying field, and its inherently stable design plus exclusive SAFE (Sensor Assisted Flight Envelope) technology made it easy to fly successfully.
  • EXQUISITE SCALE DETAIL: Construction with advanced EPO material delivers a lightweight yet durable airframe that's tough enough to handle everyday flying punishment without getting bent out of shape.
  • FAST AND EASY ASSEMBLY: Quick and easy assembly—no glue or special tools required
  • BIND-N-FLY BASIC: With BNF Basic products you can use the transmitter of your choice and bind it to the Spektrum 6-Channel Receiver included with this model.
  • UNMATCHED CAPABILITY: The wide-stance tricycle landing gear with a steerable nose wheel offers improved ground handling for easier take offs and landings on a wide variety of surfaces from paved runways to grass and even dirt.


E-flite apprentice sets 1.5M RC airplane BNF basic smart trainer with SAFE Tech (transmitter, battery and charger not included), EFL3700

You May Also Like

EverFoams Men's Moccasin Slippers Memory Foam Indoor/Outdoor Warm Suede House Shoes with Fuzzy Sherpa Lining
EverFoams Men's Moccasin Slippers Memory Foam Indoor/Outdoor Warm Suede House Shoes with Fuzzy Sherpa Lining

$ 24.00

Save: $

Dansko Rylee Sandal for Women – Memory Foam and Cork Footbed for Comfort and Arch Support – Lightweight Rubber Outsole for Long-Lasting Wear
Dansko Rylee Sandal for Women – Memory Foam and Cork Footbed for Comfort and Arch Support – Lightweight Rubber Outsole for Long-Lasting Wear

$ 71.00

$ 130.00

Save: $

Badgley Mischka Women's Alora Ii Heeled Sandal
Badgley Mischka Women's Alora Ii Heeled Sandal

$ 70.00

$ 156.00

Save: $

Low Wedge Sandals for Women Dressy Summer Women Shoes Size 12 Wide Width Sandals Wedges Off White Wedge Sandals for Women Low Heel Womens Orthopedic Sandals with Arch Support Wide Width Sandals Women
Low Wedge Sandals for Women Dressy Summer Women Shoes Size 12 Wide Width Sandals Wedges Off White Wedge Sandals for Women Low Heel Womens Orthopedic Sandals with Arch Support Wide Width Sandals Women

$ 25.00

Save: $

SELEWARE 3 Pack Heavy Duty Stainless Steel Wall Anchors for Resistance Bands – 2000 lbs Load Capacity, Space-Saving Home Gym & Physical Therapy Mounts for Strength Training & Body Weight Straps
SELEWARE 3 Pack Heavy Duty Stainless Steel Wall Anchors for Resistance Bands – 2000 lbs Load Capacity, Space-Saving Home Gym & Physical Therapy Mounts for Strength Training & Body Weight Straps

$ 17.00

$ 21.00

Save: $

Floafers Country Club Driver 2.0
Floafers Country Club Driver 2.0

$ 55.00

Save: $

ZOVE Wide Toe Box Shoes Women Extra Wide Width Tennis Sneakers Ultra Light Running Shoes for Women Non-Slip Diabetic Walking Gym Workout Trainer
ZOVE Wide Toe Box Shoes Women Extra Wide Width Tennis Sneakers Ultra Light Running Shoes for Women Non-Slip Diabetic Walking Gym Workout Trainer

$ 40.00

Save: $

Badgley Mischka Women's Brisa Heeled Sandal
Badgley Mischka Women's Brisa Heeled Sandal

$ 53.00

$ 88.00

Save: $

Women's Platform Sandals Arch Support Beach Slides for Woman Orthotic Summer Causal Cork Footbed Adjustable Buckle Elastic Band Cushion Cute Flatform sandalias de mujer
Women's Platform Sandals Arch Support Beach Slides for Woman Orthotic Summer Causal Cork Footbed Adjustable Buckle Elastic Band Cushion Cute Flatform sandalias de mujer

$ 40.00

Save: $

Floafers Unisex-Child Prodigy (Toddler/Little Big Kid) Boat Shoe
Floafers Unisex-Child Prodigy (Toddler/Little Big Kid) Boat Shoe

$ 45.00

Save: $

Cart
Luxury Resort Sandals&Fitness Trainers|Arch-support+Quick-dry
Your cart is currently empty.